The 5-Minute MVP Checklist
Ship smaller. Win sooner. New rule: time-to-signal beats time-to-perfect.
Set a 5-minute timer. Work through this page top-to-bottom. Stop when you hit your "Launch Gate."
1Pick the Signal (not the scope)
Success threshold: "If we get X signals by DATE, we iterate. If not, we kill/adjust."
2Make the Promise (and fence it)
In <time>, <persona> can <outcome> without <pain>.
3Ruthless Scope (3 > 13)
List the three actions required to produce the signal. If it's not on this list, it's not in v1.
Happy path = ≤5 clicks from URL to signal
Content before code: Can any action be faked with copy, a form, or a calendar link? If yes, do that first.
4Instrument the Path
landing_viewcta_clickintent_start (form open / booking open / checkout open)signal_done (email submitted / booking confirmed / payment authorized)Micro-targets:
- • cta_click / landing_view ≥ 5%
- • signal_done / intent_start ≥ 25%
Write your numbers:
5Launch Gate
Ship if you can tick all four:
⚠️ If any box is unchecked, cut scope until all four are true.
Copy-Paste Blocks (steal these)
Ship smaller. Win sooner.Time-to-signal > time-to-perfect.Launch a credible MVP in days, not quarters.Get a live URL, real clicks, and a clear next move—without spaghetti code or hype.Get the MVP in 5 minutesShow me the signalStart with the 5-minute cutNo fluff. No spam. Unsubscribe anytime.24-Hour Launch Plan (pick 2 channels)
Hey [Name]—building a tiny MVP: in [time] you can [outcome] without [pain]. Want early access? It's a 30-second look. Link?Icebox (what you're NOT building now)
List 3 things you're tempted to add later:
One-Page MVP Spec (fill this and you're done)
After 48 Hours — Simple Decisions
Bonus: 3 Tiny Experiments (no rebuild required)
Remember: Planning feels productive. Shipping is productive. The difference is data.
—OvernightMVP